CT CLAMP - 1P SENSOR FOR MONITORING INSTANTANEOUS CONSUMPTION CT CLAMP LOAD MANAGEMENT KIT
Dobava 3-14 dni.
Opis
The sensor is installed in the main panel after the electricity meter and is connected by cable to EVPoint EV7 and EV22 charging stations. Through it, the station can monitor the power of all consumers in the circuit, and if the limit is exceeded, it will reduce the charging power.